Cardington Hanger, Bedfordshire

Taking up and processing original concrete floor of Cardington Hanger, Bedfordshire.

Client: C Field Ltd.

As part of refurbishment works to Cardington Hanger the original floor was taken up and material crushed and processed for re-use as a sub-base for new concrete floor. Gray & Sons Ltd carried out the construction works that followed.

Work carried out 2015.Cardington Hanger, Bedfordshire 1

Cardington Hanger, Bedfordshire 2 Cardington Hanger, Bedfordshire 3 Cardington Hanger, Bedfordshire 4 Cardington Hanger, Bedfordshire 5 Cardington Hanger, Bedfordshire 6